Contractors must give every worker a site-specific induction. A good induction takes 15 to 30 minutes and covers:
- Who’s who: PSCS, site manager, safety officer, first aiders
- Site rules, working hours and sign-in / sign-out
- Site layout: access routes, exclusion zones, welfare, assembly point
- Emergency procedures and how to raise the alarm
- The particular risks on this site and how they are controlled
- PPE required
- Permits in use (hot works, excavations, confined spaces)
- How to report accidents, near misses and unsafe conditions
- Check of Safe Pass and any skills cards (CSCS) needed for their work
- Signature or confirmation that the induction was received